Seawalls, riprap and stacked stone stop wake from eroding Lake of the Ozarks shorelines. Ameren calls this bank stabilization and requires a permit first: $300 for the first 100 feet plus $1 per foot over that, finished within two years. Breakwaters need a $1,000 permit. Call (573) 410-4467 to reach a shoreline contractor.

Shoreline washing away? Call to reach a seawall contractor.

Call and we will connect you with an independent local provider.

CALL NOW: (573) 410-4467

Constant wake is hard on a shoreline. At Lake of the Ozarks, waves from boats chew at banks every summer weekend, undercutting yards, loosening dock ramps and dropping soil into the lake. A seawall, riprap or a breakwater protects the bank and gives the dock a solid place to tie in. Call (573) 410-4467 to reach an independent shoreline contractor who works the lake. Lake of the Ozarks Dock Pros is an independent referral service. We do not build docks; we connect you with an independent Ameren Missouri Certified Dock Builder who quotes, permits and builds the job.

Signs your shoreline needs work

Options for protecting the bank

Ameren permits for shoreline work

Ameren calls seawalls, riprap, stacked stone and vegetation bank stabilization, and it needs a permit before work starts. The fee is $300 for the first 100 feet plus $1 per foot over 100 feet. The application asks for the lowest elevation of the work, the distance from the toe of the bank to the seawall and the height of the wall. Bank stabilization must be finished within two years of the permit, with no extensions. A breakwater carries its own $1,000 permit fee and, like a dock, must be built by a certified builder or the owner. Work lakeward of elevation 658.5 feet or in a wetland may also need U.S. Army Corps of Engineers approval.

Fees at a glance

Ameren permitFee
Bank stabilization, first 100 feet$300
Each foot over 100 feet$1
Breakwater$1,000
Steps$50
Pier$100
Failure to obtain a permit$2,000

Construction costs depend on wall length, height, access and materials. Get a written quote that lists each item.

What drives the price

How long it takes

Small riprap jobs may take a few days. A long concrete seawall can take several weeks once the permit is issued, depending on weather, barge access and curing time.

Tie it in with your dock

Ameren's dock wiring checklist puts the dock sub-panel at the seawall next to the ramp, so a new wall is a good time to plan power, the ramp mount and lighting together. See our new dock construction page if a new dock is part of the plan.

Seawall or riprap?

A vertical concrete seawall gives a clean edge, holds a steep bank in a small footprint and makes a solid mount for a dock ramp and the electrical sub-panel. Its weakness is that waves hit it head on and can scour the bottom in front of it, and water trapped behind a wall without drainage can push it over time. Riprap, a sloped layer of large rock, absorbs wave energy instead of reflecting it and is often simpler to repair, but it takes more horizontal space and is harder to walk on. Many lots use both: a wall at the dock and riprap along the rest of the frontage. Ask your contractor which fits your bank, water depth and wake exposure, and why.

Questions to ask

Call (573) 410-4467 to get connected.

Shoreline washing away? Call to reach a seawall contractor.

Call and we will connect you with an independent local provider.

CALL NOW: (573) 410-4467

Frequently asked questions

Do I need a permit for a seawall at Lake of the Ozarks?

Yes. Ameren treats seawalls, riprap, stacked stone and plantings as bank stabilization. The permit fee is $300 for the first 100 feet plus $1 per foot over that.

How long do I have to finish a seawall?

Ameren gives two years from the permit date for bank stabilization, and extensions are not available.

Do breakwaters need a certified builder?

Yes. Ameren requires breakwaters, like docks, to be built by a certified dock builder or the owner, and the permit fee is $1,000.

Areas we serve

We connect callers across Lake of the Ozarks, Missouri (Camden, Miller, Morgan and Benton counties), including:

Local pages: Osage Beach, Lake Ozark, Camdenton.

Related services

Shoreline washing away? Call to reach a seawall contractor.

Call and we will connect you with an independent local provider.

CALL NOW: (573) 410-4467
TAP TO CALL (573) 410-4467